Home > Maritime services > Hydrographic Information > Opening times, bridges...

(59-16,4N 015-14,5E) Chart 114
Swing Bridge
Maximum vertical clearance if closed: 3,6m
Maximum width: 9,2m

(59 16,7N  15 15,6E) Osetbron
Vertical clearance: 3,8 m
Maximum width: 9,0 m
The bridge is remote controlled from Skebäcksbron


Pleasure craft:
Opening of the bridge is available maximum one time every hour in coordination with locking.
Opening October - April after agreement by contact bridge watch at least one day before passage;+46(0)19 18 91 11.

Merchant vessels:
Opening of the bridge is available at all times. Request should be made not later than 1 hour prior planned arrival to bridge. Contact the bridge watch by telephone or sound signal 300m before bridge.

Further information:
One water level gauge is placed close to the bridge to control of maximum vertical clearance. To order opening call: +46(0)19 18 91 11.

www.orebrohamn.com

Dela artikeln