Gå till meny Gå till innehåll Gå till kontakt
MSW Reportal

Search results - News archive

162 hits for News archive on the whole website

13 December 2023 Sida 1 (5) New regulations: information about persons onboard must ... Where are the regulations found, and why have these new reporting regulations been introduced? In directive

existing mines together with the establishment of new enterprises means that improvement of the Luleå ... traffic interruptions. Increased transport needs and new environ- mental legislation requires infrastructure

• Click Close Step3: Install the new certificate Perform the following steps to install ... certificate installation: Verify that your new security certificate is issued from a Swedish Maritime

football. You may read your e-mail or find Internet news from home, mail your letters and exchange major ... April) Mon-Sun: 11am-3pm Closed Christmas Eve & New Years Eve Summer (May - September) Mon-Sun: 11am-5pm

Start / Tjänster / Sjömansservice / Hamnservice

m Tunadal Saw 100 6,8 6,5 - 347o-167o Östrand, new 90 8,1 7,4 135 115o-295o Söråker/ Delta Terminal

disappears while on vacation in Co- lombia with her new boyfriend, international bureaucracy hinders June’s ... reali- zing the number was reassigned to Rob Burns' new work phone. Rob, journalist is captivated by the

League! 17:43 87% TODAY dd,mm,yyyy NEW APP! Now you can use the new app Active At Sea for easier access ... her run longer distances. – I wanted to discover new areas of Kiel and started to move further away from

Finalized proposal for new, adjusted and developed routes Doc. designation ADAPT, D.T3.5.1; WP4, ... Finalized proposal for new, adjusted and developed routes Doc. designation

Media-department we offer subscriptions for rental movies and news distribution. All this to help giving you seafarers ... Our stations and other port services Film rental, news and photo contest Competitions and sports activities

Start / Tjänster

affects estimated time of departure, occurs, shall new estimated time of departure be reported as soon

What happens if MSW Reportal does not work? All authorities that are affiliated with MSW Reportal ... procedures are to be used will be posted in the news feed "current messages" on www.mswreportal.se, as

Start / Tjänster / MSW Reportal

”IMO Panel of experts on ro-ro safety” in 1995, a new regulation 15 (c) was added to the SOLAS Convention ... SOLAS Convention this regulation was adopted as a new regulation V/7.3 Having considered the recommendations

the last few years Frej has been refitted with new towing equipment, has upgraded it´s safety equipment

the last few years Ymer has been refitted with new towing equipment, has upgraded it´s safety equipment

the last few years Frej has been refitted with new towing equipment, has upgraded it´s safety equipment

the last few years Atle has been refitted with new towing equipment, has upgraded it´s safety equipment

visits/port calls. Select "New visit" to make a vessel notification, or select "New timetable" to make a vessel ... registered visits. Select "New visit" to make a vessel notification, or select "New timetable" to make a vessel

Autobots och Decepticons. During the '90s, a new faction of Transformers - the Maxi- mals - join the ... facing their family's dark past and a host of new and more horrifying terrors that lurk behind the

paragraph 1.2.2 is added: “1.2.2 On all craft, new installation of materials containing asbestos used ... renumbered as paragraphs 1.4.33 to 1.4.44, with a new paragraph 1.4.32 being inserted as follows:

persistent work, a Swedish innovation became a new worldwide standard for improved safety at sea, ... Japan, in 1965. Today, these thoughts have led to a new global standard for maritime safety and reduced

Kvarken • Rocks from blasting to be used for LHAB´s new quay • Hydraulic Filling for land area (40 he) ... Kvarken • Rocks from blasting to be used for LHAB´s new quay • Sandy material for landfilling areas (40

two new fairway sections is being planned between Fifång–Regarn and Oaxen–Skanssundet. The new fairway ... fairway sections are needed in order to: • Create a new, safer fairway with improved capacity and accessibility

the last few years Ymer has been refitted with new towing equipment, has upgraded it´s safety equipment

of forecasting and modelling o development of new tools for presentation of satellite images o Oceanographic ... of forecasting and modelling o development of new tools for presentation of satellite images o Technical

the last few years Atle has been refitted with new towing equipment, has upgraded it´s safety equipment