Gå till meny Gå till innehåll Gå till kontakt
MSW Reportal

Search results - SSAB Steel port Brannas

291 hits for SSAB Steel port Brannas on the whole website

V4-V5 transition ETD last port The field for “ETD (Previous port)” in the overview, becomes mandatory

submitted at the same time together with the endpoint in port and ETA that are already mandatory when reporting

(tillhandahållare av behandlingsanläggning) *Prf = Port Reception Facilities

passenger ships departing from or calling at a Swedish port. Pleasure yachts and pleasure craft, however ... voyage (from the point of departure to the next port of call) exceeds 20 nautical miles (37 kilometres)

Previous port within the EU and the origin of the good is EU, manifest 60 Previous port within the ... Previous non-EU port and the origin of the goods is non-EU, manifest 65 Previous non-EU port and the origin

PILOT ARRANAGEMENTS ARE REPORTED TO SWEDISH PORT STATE CONTROL AUTHORITIES • Both ladder and

kallbadhus Hov kyrka rätten Västra skolan Öster port och Sjöfartens Teknikens hus Rådhuset Anstalten

allways be established, on the specific channel of the port/the berth facility. If not, the pilot has the right ... with two pilots onboard. Malmö: Oljehamnen (Oil port) and Swede Harbour Depth & Draught at ±0 MSL (Ref

Gothenburg is the largest port in Sweden situated in the outlet of Göta River into the Kattegatt sea ... maximum draught 7.7 m. From Lindholmen up to the Free Port the depth is 7.4 m at MW allowing maximum draught

Start / Tjänster / Lotsning / Lotsområde Göteborg

years of Seamen's Service 26 Böcker / Books 28 Port service 30 Movies 31 Photo contest 32 Adresser ... representative from Gefle Seamen’s Mission visits ships in port, and there is an unattended drop-in center within

year in succession the navigation northward to the port of Luleå could go on all winter. The Bay of Bothnia

and March, the ship was at sea, except for some port calls of short duration. Throughout the winter

were under assistance to and from ports or were in port loading or unloading) on the Norrland coast. That

mentioned that practical tests by coating high-tensile steel shell-plate with ice-resistant paint are being ... consultation with Åbo Repair Yard AB. The hardness of the steel grades involved has affected hull adhesion of the

this ice winter was unique as the channel to the port of Luleå for the first time was open for navigation ... ice class 1 A will be assisted to more than one port Vessels will be assisted only after special permission

ice, and difficult ice-ridges. An extensive re- port describing the implementation of the BEPERS project

activities and was assigned the responsibility for the port of Haraholmen. With the ice situation worsening

PILOT ARRANAGEMENTS ARE REPORTED TO SWEDISH PORT STATE CONTROL AUTHORITIES • Both ladder and

Öresundsbron, B. Klagshamn 9211 INT 1322 1:12 500 Port of Malmö augusti 2022 Special: 1:12 500 A. Limhamn ... Helsingborg – Råå februari 2015 9312 INT 1317 1:10 000 Port of Göteborg november 2023 Special: 1:10 000 A

- Vessel, IMO, net tonnage, number of calls - Port/ports where goods has been loaded/unloaded - Date ... information about a) transit cargo unloaded and loaded per port and vessel, b) date of unloading and loading of

Transport Agency. In addition to the TSS 2023:4391 the Port of Gothenburg, has further requirements. Additional ... calculate where meetings will occur. Distances in the port areas, including basins, for which the application

besök ska också göras hos Gothenburg approach ( Port Control, lotsbeställningen, VTS Göteborg), detta

pilotage in the Sound is not included in pilotage to port. 8. Piloted time refers to the time that pilotage ... pilotage ends or begins with a pilotage to or from a port, no basic fee is charged. Fee for transit pilotage

Vinterklasen 2 c Oxelösund (SSAB) Lillhammarsgrund Gustaf Dalén 12 b Oxelösund (SSAB) Mellskärsleden Gustaf

includes at least two ports excluding the departure port, and the voyage comprises at least 72 hours. ... call where a cruise liner arrives to a Swedish port in order to finish one cruise and start another