Gå till meny Gå till innehåll Gå till kontakt
MSW Reportal

Search results - Version 202 of MSW Reportal

642 hits for Version 202 of MSW Reportal on the whole website

The base of this tower has a diameter of about twelve metres and the lower part has very thick walls ... Limestone from the chapel a few kilometres north of the lighthouse that was destroyed during the Reformation

Start / Om Sjöfartsverket / Visningsfyrar

ground. The lighthouses were made of an octagonal skeleton structure made of iron that was painted red, and ... first lighthouses to be made of iron. When the technology had developed, one of the lighthouses were dismantled

Start / Om Sjöfartsverket / Visningsfyrar

9 5,76 95 Be able to debalast to a forward draft of 2,5m. Bollard 1-28 7,2 6,5 6,36 130 20 Bollard 28-41 ... 130m. Approx 250 of the berth, from the Ro-ro ramp and eastward, should be clear of vessels when turning

Density Report Page 1 of 2 Density Report Job name ID1678964640 Report Definition Density plott ... plott sjk 135 Job type Density Report Job ID 2578390339290889 Owner rikhie01 Start time 23 Oct 2022

Name of project: Measures to increase capacity and safety in Fairway 730 and the Port of Umeå. Where: ... Planned implementation period: Around 2025–2026. State of maturity: Decision concerning start ready for fairway

Start / Jobba hos oss / TEST (Permanent dold) / Farledsprojekt / Welcome to the Market Dialogue

Riskområden Om du hittar en mina Text Areas of encountering mines risk.

Start / Tjänster / Ufs och navigationsvarningar / Nuvarande navigationsvarningar

Here you can order an annual card for Södertälje Lock

Start / Tjänster / Kanaler, slussar och broar / Södertälje kanal

funding for the construction of a lighthouse. The lighthouse at the north cape of Öland is the first lighthouse ... back in 1976. This lighthouse also goes by the name of Långe Erik, but nobody knows how this name came about

Start / Om Sjöfartsverket / Visningsfyrar

Nautisk information Information from Stockholms Hamnar The lock is closed until May 31, 2024  Information ... closed until May 31, 2024  Information from Port of Stockholm regarding locks in Stockholm Position

Start / Tjänster / Kanaler, slussar och broar

The Port of Gothenburg will now start the works for reinforcing the quay with the goal of completion ... completion by the end of 2027. The Swedish Maritime Administration will adjust the schedule regarding the dredging

Start / Jobba hos oss / TEST (Permanent dold) / Farledsprojekt News

regulations on the provision of pilots, pilot orders, the allocation of pilots and pilot fees The ... The English translation of our regulations should be regarded as a service to our customers. The printed

1738 and burned down. The present lighthouse, made of stone, was built that same year, with a wooden lantern ... via a spiral walkway. This design enabled barrels of oil to be rolled all the way up to the lantern room

Start / Om Sjöfartsverket / Visningsfyrar

companies a possibility for strategic positioning of their dredging equipment, the European projects become ... most probably be available to satisfy the demand of the European market. The Malmporten Project is by

Start / Jobba hos oss / TEST (Permanent dold) / Farledsprojekt / Welcome to the Market Dialogue

582 1 470 829 737 2 411 2 207 Kalmar 3 608 3 202 4 118 4 556 7 726 7 758 Malmö 3 768 3 795 59 ... FAMOS (Finalizing Surveys for the Baltic Motorways of the Sea) som Sjöfartsverket leder. Inom Sjögeografisk

ombordvarande personer ska numera rapporteras i MSW Var finns reglerna och varför har man infört nya ... till Sjöfartsverket via Maritime Single Window (MSW). Syftet med de nya reglerna är att göra det lätt

after a few years. As Karlskrona was the home port of the Swedish Navy, the government did not want to ... be built on the rocky islet of Utklipporna, Hanöbukten, some 30 km south of Karlskrona, was an issue discussed

Start / Om Sjöfartsverket / Visningsfyrar

load, the ambition of the new regulation is to allow for a more flexible assessment of ship's load and bunker ... bunker combined with the risk level of the fairway to determine the need for a pilot. As shipping has

Start / Om Sjöfartsverket / Nyheter, press & reportage / Nyheter News

Pilot shall primarily be ordered by using MSW Reportal. If needed pilot may be ordered by contacting ... Pilot Area. Primarily: Order Pilot by using MSW Reportal. Pilot Request Center for Malmö Pilot Area Phone:

Start / Tjänster / Lotsning / Lotsområde Malmö

A preliminary order of pilot request should be made in MSW Reportal. MSW Reportal is reached via the Sweidish ... "Pilot Request centre Stockholm" must only be used if MSW is down. Pilot Request Center Stockholm +46 (0)771

Start / Tjänster / Lotsning / Lotsområde Stockholm

Security in the use of the MSW Reportal The MSW Reportals security solution is based on personal login ... login information. As user of the MSW-reportal, it is for you to take some measures to maintain security

Start / Tjänster / MSW Reportal

olyckor. Effektiv rapportering och kundsupport i MSW och i SSNS. Kortare ledtider för informations- ... 662 Summa direkta rörelsekostnader -380 431 -336 202 -288 769 Resultat före indirekta rörelseposter -297

no. Klicka Port/anchorage of call Klicka Total number of persons onboard (crew and passengers) ... departing Klicka Waste report ☐ Yes ☐No VESSEL REPORT IMO no: Ship name:

notification of the need for pilots must be made in conjunction with the ships registration in MSW Reportal. MSW ... MSW Reportal can be accessed via the Swedish Maritime Administration's website. If MSW Reportal is not

Start / Tjänster / Lotsning / Lotsområde Luleå

happens if MSW Reportal does not work? All authorities that are affiliated with MSW Reportal have their ... support MSW Support is available around the clock and can answer questions regarding the reporting in the

Start / Tjänster / MSW Reportal