Gå till meny Gå till innehåll Gå till kontakt
MSW Reportal

Search results - Pictures from 2018

203 hits for Pictures from 2018 on the whole website

and in a phase where geographic focus is changing from the Asian market to the European. By giving the ... establishing of equipment on site is of utmost importance from the tendering process and contract signing to the

Start / Farledsprojekt / Avslutade farledsprojekt / Welcome to the Market Dialogue

power and shipping (in Swedish) Recommendations from the Swedish Maritime Administration and the Swedish ... and resource assessments. image Recommendations from the Swedish Maritime Administration and the Swedish

Start / Framtidens sjöfart

Water depth is commonly referred to as "depth from the surface" but, because the sea level in our waters ... länkar Water depth is commonly referred to as "depth from the surface" but, because the sea level in our waters

Start / Tjänster / Sjökort / Sjökort, båtsportkort och e-sjökort / Tillverkning, kvalitet och mer om sjökort

of the bridge.The bridge master can be contacted from this location. Nautical information 2025-09-24: ... due to malfunction. Prognosis: bridge operational from 2025-09-25. Contact the bridge master for updated

Start / Tjänster / Kanaler, slussar och broar

and prepared to be used in vessel ECDIS: Inbound From Via To Remarks 01 RTZ 01 HTML South North Channel ... N. Trubaduren South Channel Frihamnen   Outbound From Via To Remarks 31 RTZ 31 HTML Frihamnen North Channel

Start / Tjänster / Lotsning / Lotsområde Göteborg

according to the information below.  Deviations from opening hours In the event that the bridge 'Nockebybron' ... 'Tappströmsbron' fixed opening hours, deviations from the bridge 'Tappströmsbron' opening hours of up

Start / Tjänster / Kanaler, slussar och broar

>150m minimum 0,25Nm is required for vessels to/from Älgöfjord Gastankers: LOA >125m minimun 0,5Nm Ammoniatankers: ... least 1 tugboat on both arrival and departure to / from Skallen's lighthouse, regardless of equipment. The

Start / Tjänster / Lotsning / Lotsområde Marstrand / Hamninformation

charts in the 1990’s, which means that data remaining from this time is of the same quality as then. The production ... evaluated hydrographic surveys as well as depths from digitised charts where no modern surveys exist.

Start / Tjänster / Sjökort / Sjökort, båtsportkort och e-sjökort

firsat version of the amount of data that follows from Swedish rules and Swedish legislation was determined ... the system work will gain momentum, and solutions from us and other authorities will be developed and tested

Start / Framtidens sjöfart

In addition to providing pilotage services to and from all Swedish ports, the Swedish Maritime Administration ... local conditions. We offer pilotage services to and from all Swedish ports and to all ports in the Baltic

Start / Tjänster / Lotsning

pilot boarding point for vessels travelling to and from Södertälje/Lake Mälaren and Nynäshamn/Norvik. The ... necessary permits and exemptions, such as exemptions from shoreline protection regulations. The Approach

Start / Farledsprojekt

From To Distance Time at 11 kts Time at 13 kts M1 Trelleborg roads 72 6,5 5,5 M1 Flinten SW 46 4,2 3 ... arranges boarding for northbound vessels. Information from the vessel shall include destination, ETA, GRT,

Start / Tjänster / Lotsning / Lotsområde Malmö

The vessel's passage planning shall include the voyage between the pilot boarding ... traffic situation and weather situation, deviations from the routes may of course be necessary and then compatible

Start / Tjänster / Lotsning / Lotsområde Luleå

Designs had already been completed by the 1820s, but no lighthouse was built here until directed ... The lighthouse station was staked out 1400 metres from the sea, up on Kleven mountain. A cylindrical tower

Start / Om oss / Fyrar och kulturfastigheter / Visningsfyrar

length of 45 meters or more Areas VHF channel 9: From Göta river bridge in the south to Gälle Udde (Gälle ... in Trollhättan. Icebreaker agent on call Apart from the part covered by VTS-Göteborg, there is no VTS

Start / Tjänster / Lotsning / Lotsområde Vänern / Hamn- och farledsinformation / Nautisk Information

Skebäcksbron Position 59° 16,4'N 015° 14,5'E Swing Bridge Vertical clearance: 3,6 m Horizontal ... clearance: 9,0 m The bridge is controlled remotely from Skebäcksbron Opening times Merchant vessels Opening

Start / Tjänster / Kanaler, slussar och broar

Maximum draught at mean sea level (MW), in the fairways to: Tor Harbour via the North ... variations inside the port due to the fresh water outflow from the Göta River. *) Max draught at berth 801 is 19

Start / Tjänster / Lotsning / Lotsområde Göteborg / Riktvärden & Restriktioner

out maintenance work on the bridge 'Älmstabron' from October 16 to November 27. The work requires a work ... which temporarily reduces the vertical clearance from 12.0 metres to 9.0 metres. The work does not affect

Start / Tjänster / Kanaler, slussar och broar

daylight. Such a departure, which means exemption from usual practice, can take place only subject to consultation ... Terminal - Cruise Vessels Max wind for vessels with LOA from 215 m to 225 m: 14 m/s at Karet. Max wind for vessels

Start / Tjänster / Lotsning / Lotsområde Göteborg / Riktvärden & Restriktioner

when passing Brofjorden approach buoy. On departure from crude oil jetty the visibility shall be minimum ... 18 m/s or more from south over west to north. If the  mean wind is 25m/s or more from south over west

Start / Tjänster / Lotsning / Lotsområde Marstrand / Hamninformation

Updates Update at 15:33 At 15:05, the rescue operation from the Swedish Maritime Administration ended. The continued ... Swedish Sea Rescue Society. When this is done, divers from the Swedish Armed Forces and the Swedish Coastguard

Start / Om oss / Nyheter & press / Nyheter News

pipeline, road or rail, previously shipped by sea from a non-Member State (IOPC), has to report the quantity ... occurs in Member States, resulting from spills of persistent oil from tankers. Sweden has acceded the 1992

Start / Tjänster / Anlöpstjänster

exchanged between actors involved in a port call, from the time the ship leaves the previous port until ... players in the call ·         Transfer of goods from land to sea Näringslivets Transportråd Näringslivets

Start / Framtidens sjöfart

operations to enable sustainable shipping to and from Sweden. bg-transparent Earlier this year, the ... identifying which government agencies could quickly switch from fossil fuels to fossil-free alternatives. The review

Start / Om oss / Nyheter & press / Nyheter News

Landsort and Södertälje. Planned implementation period: From 2024 to 2025, inclusive. State of maturity: The ... infrastructure plan. Planned depth: Dredging depth varies from 14.0 to 11.65 m. Preliminary dredging volume: Approximately

Start / Farledsprojekt / Avslutade farledsprojekt / Welcome to the Market Dialogue