Gå till meny Gå till innehåll Gå till kontakt
MSW Reportal

Search results - New routeing system in Kattegat

913 hits for New routeing system in Kattegat on the whole website

port due to present traffic restrictions. The sea routes to Luleå are being upgraded to adhere to the Swedish ... there is ice in the Gulf of Bothnia for five to six months of the year, the transport route close to the

Start / Jobba hos oss / TEST (Permanent dold) / Farledsprojekt / Welcome to the Market Dialogue

CPI-CS is now available. The percentage increase in the CPI-CS for the period is 10.9 percent, which ... results in a total fee change for the fairway fee of 8.4 percent. Pilot fees The increase in the pilot

Start / Tjänster / Anlöpstjänster / Sjöfartsverkets farleds- och lotsavgifter

of project: The Skandia Gateway – Deeper fairway in the Port of Gothenburg. Where: Gothenburg. Widening ... before summer 2022. State of maturity: Main hearing in the Land and Environment Court ends on April 1st

Start / Jobba hos oss / TEST (Permanent dold) / Farledsprojekt / Welcome to the Market Dialogue

Excel files to the Swedish Maritime Administration. In addition to this, ships also need to send the information ... reporting. With the new legislation from the EU, ships will be able to send the information in the same digital

Start / Framtidens sjöfart / Smarta anlöp / EMSWe

(adopted on 29 November 2010) NEW MANDATORY SHIP REPORTING SYSTEM "IN THE SOUND BETWEEN DENMARK AND ... Life at Sea, 1974, as amended (SOLAS Convention), in relation to the adoption of mandatory ship reporting

Select area for routes to local port Important information The digital routes should not be used as ... as a complement to these. When using the digital route plans and other information on these pages, therefore

Start / Tjänster / Lotsning / Lotsområde Kalmar

Important information The digital route plans should not be used as a substitute for regular charts and ... as a complement to them. When using the digital route plans and other information on these pages must

Start / Tjänster / Lotsning / Lotsområde Luleå

Tuesday, April 23 between 11:00-13:00, MSW Reportal will be updated. The system will be down ... 11:00-13:00, MSW Reportal will be updated. The system will be down during the time. For questions, please

electronically in the customer´s financial system. All customers will be transferred to the new way of invoicing ... an interest in receiving our invoices electronically will be able to do so with start in November 2021

Start / Om Sjöfartsverket / Nyheter, press & reportage / Nyheter News

Studsvik RORO= QL 70 m Daylight only PMD= 5,3 UKC=0,5 Windrestrictions At average winds between ... vessel can be safely navigated through fairways and in port. This evaluation is based on previous calls

Start / Tjänster / Lotsning / Lotsområde Oxelösund / Riktvärden & Restriktioner

project: Measures to increase capacity and safety in Fairway 271 to Karlskrona. Where: Fairway 271. Planned ... concerning start ready for fairway inquiry that begins in spring 2022. Preliminary quantity of dredging spoil:

Start / Jobba hos oss / TEST (Permanent dold) / Farledsprojekt / Welcome to the Market Dialogue

Navigational warnings.

Start / Tjänster / Ufs och navigationsvarningar / Nuvarande navigationsvarningar

The process for registering & certifying a vessel in CSI: 1) Shipping company request login to Clean Shipping ... dex.com 4) Next step is to certify the vessel(s) in order to access rebates. Ask accredited verification

Start / Tjänster / Anlöpstjänster / Sjöfartsverkets farleds- och lotsavgifter

Currently there is not possible to choose document type from the drop down menu in the Documentation ... document type from the drop down menu in the Documentation block in MSW Rreportal. This has been escalated

Routes and passage plan Permitted Maximum Drafts in Fairways (PMD) based on BSCD2000 N. Kränkan Lt -

Start / Tjänster / Lotsning / Lotsområde Oxelösund

along the berth. Western berth 5 4,86 Western berth in south 5 4,86 Karlskrona 271 Verkö 1 8,9 8,76 160 ... buoymooring only in daylight. ABB Pier North 9,3 8,8 8,66 160 Max beam 33m, buoymooring only in daylight.

safety in Fairway 730 and the Port of Umeå. Where: Fairway 730 (and potentially the port area in Umeå) ... concerning start ready for fairway inquiry that begins in spring 2022. Preliminary dredging volume: Fairway

Start / Jobba hos oss / TEST (Permanent dold) / Farledsprojekt / Welcome to the Market Dialogue

Bascule bridge Vertical clearance: 1,8 m Opening times May 1 – September 30 Merchant vessels Opening of the bridge is available on request.  Contact the bridge master on telephone: +46(0)490-25 49

Start / Tjänster / Kanaler, slussar och broar